Feedback
We express our gratitude to our clients for entrusting us with their projects and for providing positive feedback on our collaborative efforts. We are prepared to facilitate energy supply for your facility. Our process includes conducting an inspection, developing preliminary technical solutions, undertaking financial and production planning, and presenting a comprehensive technical and commercial proposal for your review. Upon acceptance of our proposal, we will proceed with equipment supply, oversee installation and commissioning, and provide personnel training following the installation of the power plant at your facility. We also take responsibility for warranty and post-warranty maintenance work.
Leave your review
Yermekbay K., Deputy Chairman of the Board for Operations - Chief Engineer—11 October 2022
Mangistau Regional Electric Grid Company JSC
Since 2019, the team at ETS-Astana LLP has been overseeing the operation of a 5 MW wind farm (ВЭС-5 MW) and associated cable-overhead power transmission lines (COPT). These facilities are interconnected with the 110 kV/10 kV Akshukur substation of Aktau Power Distribution Zone, managed by Mangistau Regional Electric Grid Company JSC.
Throughout the construction of the power plant and high-voltage power transmission line, the personnel of ETS-Astana LLP have demonstrated exceptional expertise and professionalism. A diplomatic and constructive cooperation was established in the course of the negotiation process for the design and selection of connection points to the 110 kV substation. During the commissioning of the facilities, comprehensive testing of electrical equipment was conducted meticulously and competently according to a jointly developed program.
Presently, the personnel of ETS-Astana LLP are responsible for the operation of the 5 MW wind farm and the COPT. Professional operational management of energy facilities is maintained, and personnel exhibit clear and coordinated actions during joint operational switchings or in the event of emergency situations.
The high level of operational organization, skilled employees, and prompt response to non-standard situations ensure an adequate level of reliability for facilities and the electrical network as a whole. Mangistau Regional Electric Grid Company JSC recommends ETS-Astana LLP as a reliable partner in the energy supply sector.
Throughout the construction of the power plant and high-voltage power transmission line, the personnel of ETS-Astana LLP have demonstrated exceptional expertise and professionalism. A diplomatic and constructive cooperation was established in the course of the negotiation process for the design and selection of connection points to the 110 kV substation. During the commissioning of the facilities, comprehensive testing of electrical equipment was conducted meticulously and competently according to a jointly developed program.
Presently, the personnel of ETS-Astana LLP are responsible for the operation of the 5 MW wind farm and the COPT. Professional operational management of energy facilities is maintained, and personnel exhibit clear and coordinated actions during joint operational switchings or in the event of emergency situations.
The high level of operational organization, skilled employees, and prompt response to non-standard situations ensure an adequate level of reliability for facilities and the electrical network as a whole. Mangistau Regional Electric Grid Company JSC recommends ETS-Astana LLP as a reliable partner in the energy supply sector.
Письмо МРЭК в ЭТС-А. 11.10.2023+
215,2 KB
Adilov A.A., Director of BEST-Group NS LLP—27 January 2021
BEST-Group NS LLP
ETS-Astana LLP has been cooperating with BEST-Group LLP since 2019. During this period, a joint project was undertaken for the construction and commissioning of a 5 MW wind farm near the city of Aktau, the regional center of the Mangistau region (hereafter referred to as the 5 MW Akshukur wind farm).
Throughout the project, ETS-Astana LLP has proven itself to be a highly skilled organization, actively engaged in the construction process and demonstrating the ability to proficiently and swiftly address a variety of technical challenges that arise during production. The exceptional quality and timely completion of the work facilitated the swift commissioning of the installed equipment.
Presently, the staff at ETS-Astana LLP is responsible for the ongoing and uninterrupted operation of the 5 MW Akshukur wind farm. Routine equipment maintenance is conducted promptly and according to schedule, and in the event of emergency shutdowns, immediate measures are taken to restore operational functionality.
The team’s level of professionalism meets the necessary qualifications to fulfill their assigned tasks, warranting a commendable rating. BEST-Group LLP recommends ETS-Astana LLP to interested companies seeking a reliable partner.
Throughout the project, ETS-Astana LLP has proven itself to be a highly skilled organization, actively engaged in the construction process and demonstrating the ability to proficiently and swiftly address a variety of technical challenges that arise during production. The exceptional quality and timely completion of the work facilitated the swift commissioning of the installed equipment.
Presently, the staff at ETS-Astana LLP is responsible for the ongoing and uninterrupted operation of the 5 MW Akshukur wind farm. Routine equipment maintenance is conducted promptly and according to schedule, and in the event of emergency shutdowns, immediate measures are taken to restore operational functionality.
The team’s level of professionalism meets the necessary qualifications to fulfill their assigned tasks, warranting a commendable rating. BEST-Group LLP recommends ETS-Astana LLP to interested companies seeking a reliable partner.
Отзыв БЕСТ-Групп НС
220,7 KB
We will provide your business power supply. Just tell us about your project!